117. New Road from Island Road to Stanley.-A contract, comprising the construction of a 25′ road from the Main Island Road at Stanley to R.B.L. 243 at Stanley, together with a branch road to Stanley Police Station, including all necessary walling, bridges, culverts and cross drainage, was let to Messrs. Hop Hing & Son on 3.2.33 for a sum of $46,911.50. Good progress was maintained during the year.
Expenditure
$29,325.29
118. Kennedy Road-Completion of Widening.-The widen- ing to 30 feet of a further section of this road, adjoining the Magazine, was satisfactorily carried out by Messrs. Sang Lee & Co.
Expenditure
DRAINAGE.
$6,620.01
119. Additional Septic Tank at Repulse Bay. This work was begun in July and was completed by the end of the year.
Expenditure
$5,869.79
120. New Sewer-Wongneichong Gap to Island Road, in con- nection with the development of sites along this road.-This work, which involved the laying of 7,857 lineal feet of 6" diameter pipes, was begun in May and was satisfactorily completed by the end of October,
Expenditure
MISCELLANEOUS,
$27,000.00
121. Chinese Cemeteries.-Laying out new areas.—
-Work carried out under this head is referred to in paragraph 31 of this Report.
Expenditure
$5,821.77
area.—A new
$4,783.98
122. Colonial Cemetery-Laying out new terrace for graves was laid out in this cemetery.
Expenditure
123. Tsat Tse Mui Quarry-Covering to Mixing Plant, New High Tension Cable and a Transformer House. This work was referred to in paragraph 114 of last year's Report. The erection of steel-work was put in hand and the high tension cable was partly laid before the end of the year.
1933 Expenditure
$5,884.35
Expenditure up to 31st Dec., 1933..$11,217.06
T
►
35
124. Tsat Tse Mui Quarry-Extension and Improvements.- Under this heading a weighbridge was installed and 10 bins of 4 cubic yards capacity each were provided to improve the present loading arrangements at the Quarry.
Expenditure
$6,191.53
125. Rewiring of Government Buildings.-The following twenty-five buildings were completely rewired for fans and lights (total number of points, 2,292):-Hong Kong Volunteer Head- quarters; Nos. 405-407, The Peak; Nos. 1-8 Leighton Hill; Nos. 97, 99, 101, 102, 105 and 107 Wongneicheong Road; Wanchai Market; Wanchai Scavenging Coolie Quarters; Belcher Street Scavenging Coolie Quarters; Hong Kong Magistracy Building; D.S.P.'S Quarters, Central Police Station; Belilios School and Central Market.
Expenditure
$21,245.41
126. Laying Telephone Cable from the main route Victoria Gap-Gough Hill.--The old aerial route was replaced by an underground cable.
Expenditure
$5,428.92
127. Laying Telephone Cable between G.P.0, and Cable Hut at Happy Valley.-The cable was laid to supplement an existing one which was too small for its purpose.
Expenditure
$25,155.78
128. Reinstatement of Government Retaining Walls.—This work was referred to in paragraph 113 of last year's Report.
One of the walls on the Tai Hang Road was in bad condition and a contract for taking down about 200 linear feet of the wall and rebuilding it in cement concrete with rubble facework was let to the General Construction Co. on 28.10.33 for a sum of $7,080.00. Good progress was made towards the end of the year.
Expenditure
$4,314.34
129. Central Police Station: Extension to Store. The work consisted of enclosing a portion of the ground floor verandah of the existing Store to provide increased accommodation.
Expenditure
$1,189.90
130. Victoria Hospital: Tennis Court.-The work consisted of relevelling the site, forming channels, and the erection of a wire netting fence.
Expenditure
$2,345.96